Home : News : Photos
Image Gallery
James O’Riley, U.S. Army Corps of Engineers Europe District project engineer and contracting officer’s representative, briefs Col. Brad Bane and Command Sgt. Maj. Kofie Primus, the 405th Army Field Support Brigade’s command team, at the new Army Prepositioned Stock-2 site in Powidz, Poland, which is under construction. When complete, the APS-2 site will be comprised of 650,000 square feet of humidity-controlled warehouse space, a vehicle maintenance facility and supporting facilities. Also, there will be 58,000 square foot earth-covered munitions storage area nearby.
210429-A-SM279-746.JPG Photo By: Cameron Porter

POWIDZ, Poland - Col. Brad Bane and Command Sgt. Maj. Kofie Primus, the 405th Army Field Support Brigade’s command team, along with a group of engineers and personnel from the 50th Regional Support Group walk the grounds of the new Army Prepositioned Stock-2 site in Powidz, Poland. Construction on the new APS-2 site is scheduled to be completed sometime in mid- to late-2022.


DOWNLOAD PHOTO (2.01 MB)


This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at http://www.dimoc.mil/resources/limitations.html , which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.



Back to Gallery